Miller Road Interchange

Primary Service

  • Roadway

Client

  • City of Brecksville

Location

  • Brecksville

Tasks Performed

  • Traffic Study
  • Interchange Modification Study
  • Surveying
  • Mapping
  • Bridge Design
  • Drainage Design
  • Funding
  • Maintenance of Traffic
  • Right-of-Way Plan Development
  • Roadway Design
  • Stormwater Analysis
  • Traffic Signal Design
  • Sanitary Sewer Design

Project Description

Euthenics was hired by the City of Brecksville to perform an Interchange Modification Study for the completion of the southern half of the Interstate 77 and Miller Road Interchange. Services include use of Highway Capacity Software to analyze the traffic data and study the need for controlled signalized intersections, freeway segments, and ramps with multiple alternative iterations. Required storage lane calculations and projections were included in this project. After winning TRAC funding for construction, Euthenics completed detailed design beginning with survey and basemapping, roadway widening, improved intersections and ramps with signals, storm sewer design with best management practices, widening of the existing bridge over I-77 including structural steel painting, and right-of-way plans.