CUY/MED I-71 Preliminary Feasibility/Traffic Study
Project Photos
Tasks Performed
- Right-of-Way
- Roadway Design
- Surveying
- Utility Coordination
- Traffic Signal Design
- Traffic Study
Project Description
Strongsville hired Euthenics to perform a preliminary feasibility traffic study to determine whether various configurations of an interchange with I-71 and Boston Road will improve traffic delays for travelers through the study region from SR 82 on the north to SR 303 on the south.